Description

Located in the heart of Forte dei Marmi, in one of the town’s most prestigious residential areas, this elegant newly built villa is currently under construction and features generous spaces, contemporary architecture, and high-quality finishes.

The property is arranged over three levels and sits on a plot of approximately 1,290 sqm, enhanced by a large private garden and a generous swimming pool of about 65 sqm.

The villa offers a total surface area of approximately 476 sqm, distributed between basement, ground floor, and first floor.

The ground floor hosts the main living areas, designed to maximize natural light and create a seamless connection with the outdoor spaces and garden. Large openings enhance the indoor-outdoor relationship, making the living spaces ideal for everyday living and entertaining.

The first floor accommodates the sleeping area, with spacious bedrooms and well-organized layouts designed for comfort and functionality.

The basement level provides additional large spaces that can be used as technical rooms, wellness area, gym, home cinema, or service areas.

The villa is designed with high construction standards and premium finishes, with great attention to materials and architectural elegance.

The surrounding garden ensures privacy and tranquility, while the swimming pool becomes the focal point of the outdoor living area.

This property represents an excellent opportunity for those seeking a modern newly built villa in the heart of Versilia, just a short distance from the sea and the center of Forte dei Marmi.

Location:  Forte dei Marmi. Sea: 1.2 km

Energy rating: A+.

Services

  • Swimming pool
  • Garden 1300 sqm
  • Aria condizionata
  • Panoramic view
  • Private car park
  • Alarm system
  • Automated gate
  • Video surveillance
  • Mosquito nets
  • Barbecue
  • TV Color
  • TV Sat
  • Phone
  • WiFi
  • Washing machine
  • Dishwasher
  • Fully equipped kitchen

Availability

September  2026

Sa Su Mo Tu We Th Fr
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30

October  2026

Sa Su Mo Tu We Th Fr
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31

November  2026

Sa Su Mo Tu We Th Fr
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30

December  2026

Sa Su Mo Tu We Th Fr
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31

January  2027

Sa Su Mo Tu We Th Fr
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31

February  2027

Sa Su Mo Tu We Th Fr
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28

March  2027

Sa Su Mo Tu We Th Fr
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31

April  2027

Sa Su Mo Tu We Th Fr
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

May  2027

Sa Su Mo Tu We Th Fr
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31

June  2027

Sa Su Mo Tu We Th Fr
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30

July  2027

Sa Su Mo Tu We Th Fr
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31

August  2027

Sa Su Mo Tu We Th Fr
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31

September  2027

Sa Su Mo Tu We Th Fr
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30

October  2027

Sa Su Mo Tu We Th Fr
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31

November  2027

Sa Su Mo Tu We Th Fr
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30

December  2027

Sa Su Mo Tu We Th Fr
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31